{"id":5066,"date":"2026-09-07T15:12:53","date_gmt":"2026-09-07T10:12:53","guid":{"rendered":"https:\/\/bondstonelaw.com\/?page_id=5066"},"modified":"2026-09-07T19:46:26","modified_gmt":"2026-09-07T14:46:26","slug":"epc-contracts-and-fidic-in-kazakhstan","status":"publish","type":"page","link":"https:\/\/bondstonelaw.com\/ru\/epc-contracts-and-fidic-in-kazakhstan\/","title":{"rendered":"EPC Contracts &#038; FIDIC in Kazakhstan"},"content":{"rendered":"<p style=\"font-size: 13px; color: #888; margin: 0 0 24px 0; font-family: Arial,sans-serif;\"><span style=\"color: #666;\">EPC Contracts and FIDIC in Kazakhstan<\/span><\/p>\n<p><!-- ARTICLE LABEL --><\/p>\n<p style=\"color: #8b1a1a; font-size: 12px; letter-spacing: 2px; text-transform: uppercase; margin: 0 0 6px 0; font-weight: 600;\">REAL ESTATE &amp; CONSTRUCTION \u00a0\u00b7\u00a0 EPC &amp; CONSTRUCTION CONTRACTS<\/p>\n<p><!-- INTRO --><\/p>\n<p>Kazakhstan&#8217;s infrastructure pipeline \u2014 spanning BRI corridor logistics, energy sector capital projects, and Special Economic Zone industrial construction \u2014 draws EPC contractors from China, Turkey, Europe, and the Gulf region. <strong>FIDIC-based contracts<\/strong> are standard in these mandates, but they must be carefully adapted to Kazakhstan law: the Civil Code governs construction contracts (Chapter 33), the Law on Architectural, Town-Planning and Construction Activity No. 242-IV sets mandatory licensing and expert examination requirements, and currency control rules under Law No. 57 regulate cross-border payment flows.<\/p>\n<p><!-- KEY FACTS LINE --><\/p>\n<p style=\"color: #393939; font-size: 16px;\"><strong>Primary authority:<\/strong> Civil Code of the Republic of Kazakhstan No. 409-I, Chapter 33 (construction contract) \u00a0\u00b7\u00a0 Law on Architectural, Town-Planning and Construction Activity No. 242-IV \u00a0\u00b7\u00a0 Law on Currency Regulation and Currency Control No. 57 \u00a0\u00b7\u00a0 <a style=\"color: #a68f65; text-decoration: none;\" href=\"https:\/\/adilet.zan.kz\" target=\"_blank\" rel=\"noopener\">adilet.zan.kz<\/a><\/p>\n<p style=\"color: #393939; font-size: 16px;\"><strong>Sectors:<\/strong> Oil &amp; gas infrastructure \u00a0\u00b7\u00a0 Power generation &amp; renewables \u00a0\u00b7\u00a0 BRI corridor logistics &amp; transport \u00a0\u00b7\u00a0 Industrial &amp; manufacturing (SEZ) \u00a0\u00b7\u00a0 Commercial real estate development \u00a0\u00b7\u00a0 Mining infrastructure<\/p>\n<p><!-- \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 --><\/p>\n<h2>Which FIDIC Books Apply in Kazakhstan?<\/h2>\n<p>FIDIC contract forms are not incorporated into Kazakhstan statute \u2014 they apply as a matter of contract only where the parties expressly adopt them. Where a FIDIC provision conflicts with a mandatory rule of the Kazakhstan Civil Code, the Civil Code prevails. In practice, this means EPC contracts for Kazakhstan projects require deliberate adaptation, not a standard-form adoption.<\/p>\n<div style=\"display: grid; grid-template-columns: 1fr 1fr 1fr; gap: 16px; margin: 20px 0 36px 0;\">\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<p style=\"color: #8b1a1a; font-size: 11px; letter-spacing: 2px; text-transform: uppercase; font-weight: bold; margin: 0 0 6px 0;\">SILVER BOOK<\/p>\n<h3>EPC \/ Turnkey<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Most common for oil &amp; gas, energy, and power generation projects in Kazakhstan. The contractor bears full design risk and is responsible for delivering a completed, operational facility. Employer&#8217;s interference is limited \u2014 critical for fixed-price mandates.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<p style=\"color: #8b1a1a; font-size: 11px; letter-spacing: 2px; text-transform: uppercase; font-weight: bold; margin: 0 0 6px 0;\">YELLOW BOOK<\/p>\n<h3>Plant &amp; Design-Build<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Used in industrial, manufacturing, and BRI corridor logistics projects. Contractor designs and builds to Employer&#8217;s Requirements; Employer retains approval rights at design stages. Variation mechanism is more active \u2014 requires careful local adaptation.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<p style=\"color: #8b1a1a; font-size: 11px; letter-spacing: 2px; text-transform: uppercase; font-weight: bold; margin: 0 0 6px 0;\">RED BOOK<\/p>\n<h3>Construction<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Civil works where the Employer provides design \u2014 roads, public infrastructure, state-funded projects. Frequently referenced in Kazakh public procurement contracts. Contractor builds to Employer&#8217;s design; the Engineer&#8217;s role is most prominent under this form.<\/p>\n<\/div>\n<\/div>\n<p><!-- \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 --><\/p>\n<h2>Key Local Law Adaptations Required<\/h2>\n<p>A FIDIC contract for a Kazakhstan project that is not adapted to local law exposes both contractor and employer to gaps in enforceability, unenforceable payment protections, and dispute resolution clauses that cannot be invoked as intended. Bond Stone&#8217;s EPC practice addresses the following adaptations on every mandate:<\/p>\n<div style=\"display: grid; grid-template-columns: 1fr 1fr; gap: 16px; margin: 20px 0 36px 0;\">\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>Payment Mechanisms &amp; Currency Control<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Contracts between Kazakhstan residents must be denominated in KZT (Law No. 57). Non-resident contractors may invoice in USD subject to NBK notification. Offshore payment structures \u2014 common in BRI-funded projects \u2014 require advance currency control structuring. Interim certificate payment timelines must be stated explicitly; FIDIC&#8217;s default 56-day payment period is enforceable but must be matched to the contract&#8217;s payment schedule.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>Performance Bonds &amp; Bank Guarantees<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Performance bonds operate as demand bank guarantees under Civil Code Art. 329\u2013336. Foreign bank guarantees are accepted in practice but may require a local correspondent bank to confirm. Major Kazakh banks \u2014 Halyk Bank, BCC, Freedom Bank \u2014 are standard issuers. Bond Stone advises on guarantee wording to ensure the demand mechanism is clean and the guarantee is callable without court proceedings.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>Variation &amp; Change Orders<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">FIDIC Clause 13 variation mechanism is valid but must be reconciled with Civil Code Art. 403, which requires all contract amendments to be in writing. Oral instructions from the Engineer carry no legal weight and cannot bind the Employer under Kazakhstan law. All variation orders must be countersigned. Bond Stone recommends a standalone Variation Order Protocol appended to the EPC contract.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>Limitation Periods<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">General limitation: 3 years (Civil Code Art. 178). Construction defect claims: 5 years for hidden defects (Civil Code Art. 635) \u2014 this extended period overrides FIDIC&#8217;s Defects Notification Period where there is a conflict. Limitation periods under Kazakhstan law are not waivable by contract; FIDIC clauses purporting to shorten the statutory period are void.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>State Expert Examination (<em>gosekspertiza<\/em>)<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Mandatory state expert examination of design documentation is required before a construction permit is issued for any project above 300 m\u00b2 \u2014 Law No. 242-IV, Art. 60. This is the EPC contractor&#8217;s responsibility under Silver and Yellow Book forms. State Expert Examination delays are not treated as Force Majeure under Kazakhstan administrative practice \u2014 programme contingency must be built in contractually.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>Set-Off &amp; No-Set-Off Clauses<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">The Civil Code (Art. 370) permits set-off as a default right. This can defeat FIDIC&#8217;s pay-when-certified protection and expose contractors to unilateral deductions by the Employer. A properly drafted no-set-off clause is essential in Kazakhstan EPC contracts and must comply with Civil Code mandatory rules on contract formation.<\/p>\n<\/div>\n<\/div>\n<p><!-- \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 --><\/p>\n<h2>Variation Claims: Getting Paid in Kazakhstan<\/h2>\n<p>Variation and additional cost claims are the most common source of EPC dispute in Kazakhstan. The intersection of FIDIC&#8217;s notice requirements and Kazakhstan Civil Code formality rules creates specific risks for contractors who rely on standard FIDIC procedures without local law adaptation.<\/p>\n<p><strong>The 28-day notice trap:<\/strong> FIDIC Clause 20.1 (2017 edition Clause 20.2) requires the contractor to give notice of a claim within 28 days of becoming aware of the event. Under Kazakhstan law, this contractual notice requirement is valid and enforceable. A contractor who misses the 28-day window and then raises a variation claim faces the argument that the right to recover is time-barred \u2014 courts and arbitral tribunals in Kazakhstan have given weight to this argument. Bond Stone advises contractors to implement a claim notice tracking system as a matter of project governance from day one.<\/p>\n<p><strong>The Engineer&#8217;s authority:<\/strong> The FIDIC Engineer&#8217;s power to bind the Employer is not automatically recognised under Kazakhstan law. For the Engineer&#8217;s instructions, approvals, and determinations to bind the Employer, the Engineer&#8217;s authority must be explicitly stated in the EPC contract and must be consistent with the Engineer&#8217;s power of attorney. An instruction from an Engineer operating under an unclear or expired POA is legally vulnerable.<\/p>\n<p><!-- \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 --><\/p>\n<h2>EPC Contract Dispute Resolution Options in Kazakhstan<\/h2>\n<p>The FIDIC Dispute Adjudication Board (DAB) is not a recognised procedural mechanism under Kazakhstan civil procedure law. Parties electing FIDIC without modifying the dispute resolution clause may find the DAB process unenforceable at the enforcement stage. The election of a dispute resolution forum is one of the most consequential decisions in an EPC contract for a Kazakhstan project.<\/p>\n<div style=\"display: grid; grid-template-columns: 1fr 1fr; gap: 16px; margin: 20px 0 32px 0;\">\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>AIFC Court \u2014 Recommended for International Mandates<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">English-language proceedings. Common law jurisdiction. Judges drawn from international pool (UK, Australia, Singapore). No requirement to translate evidence into Kazakh. AIFC Court judgments are enforceable in Kazakhstan through a streamlined recognition procedure. Bond Stone holds <strong>AIFC Legal Adviser<\/strong> status and regularly advises on AIFC Court proceedings.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>ICC \/ SCC Arbitration<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Standard for large BRI-corridor and energy projects. Kazakhstan is a signatory to the New York Convention \u2014 foreign arbitral awards are recognised and enforced by Kazakhstan courts. ICC and SCC arbitration seated in Paris, Stockholm, or Singapore are all effective options. Enforcement of an ICC award against a Kazakh state entity or SOE requires additional steps.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>Kazakhstan Economic Courts<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Specialised inter-district economic court in Almaty and Astana. Proceedings in Kazakh and Russian. Enforcement is direct and immediate. Practical for smaller disputes where speed and cost matter more than language. Mandatory pre-trial demand \u2014 30-day written demand \u2014 must be served before filing.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px;\">\n<h3>Pre-Trial Demand Procedure<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.75;\">Before commencing court proceedings in Kazakhstan for any construction dispute, a written pre-trial demand must be served on the counterparty. The default response period is 30 days unless the contract specifies otherwise. Failure to serve the demand \u2014 or to allow the response period to expire \u2014 results in the claim being returned unfiled. Bond Stone drafts demands that are legally compliant and strategically calibrated.<\/p>\n<\/div>\n<\/div>\n<p><!-- \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 --><\/p>\n<h2>Frequently Asked Questions \u2014 EPC Contracts in Kazakhstan<\/h2>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px; margin: 16px 0;\">\n<h3>Is FIDIC legally binding in Kazakhstan?<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.7; margin: 0;\">FIDIC contracts are not adopted by statute in Kazakhstan. They apply only where the parties expressly incorporate them into their agreement. Where FIDIC provisions conflict with mandatory rules of the Kazakhstan Civil Code \u2014 for example on limitation periods or written formality requirements \u2014 the Civil Code prevails. This makes local law adaptation of FIDIC contracts essential, not optional.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px; margin: 16px 0;\">\n<h3>How are construction disputes resolved in Kazakhstan?<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.7; margin: 0;\">International contractors most commonly choose the AIFC Court (English-language, common law, no translation requirement), ICC or SCC arbitration seated abroad (enforced under the New York Convention), or Kazakhstan&#8217;s specialised economic courts (fast enforcement, proceedings in Russian\/Kazakh). A mandatory pre-trial written demand of 30 days applies before court filing in most construction disputes. The FIDIC Dispute Adjudication Board mechanism is not directly enforceable under Kazakhstan procedural law without contractual adaptation.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px; margin: 16px 0;\">\n<h3>Can an EPC contractor in Kazakhstan recover for variations without written notice?<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.7; margin: 0;\">Strict written notice is strongly recommended. FIDIC Clause 20.1 (2017 Cl. 20.2) sets a 28-day notice period for claims arising from events or instructions. Under Kazakhstan Civil Code Art. 403, all contract amendments must be in writing \u2014 oral Engineer instructions carry no legal weight and cannot form the basis of a valid variation claim. Contractors who fail to give timely written notice face the real risk of losing their right to recover.<\/p>\n<\/div>\n<div style=\"border-left: 4px solid #a68f65; padding: 16px 20px; margin: 16px 0;\">\n<h3>What currency can EPC contracts use in Kazakhstan?<\/h3>\n<p style=\"color: #393939; font-size: 16px; line-height: 1.7; margin: 0;\">Contracts between two Kazakhstan-resident entities must be denominated and settled in KZT, unless an exemption under the Law on Currency Regulation and Currency Control No. 57 applies. Non-resident contractors may invoice in USD or EUR, subject to NBK notification requirements. Cross-border payment flows in BRI-funded projects \u2014 where funding is disbursed from Chinese state banks \u2014 require specific currency control structuring. Bond Stone advises on compliant payment architecture before contract execution.<\/p>\n<\/div>\n<p><!-- \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 --><br \/>\n<!-- INDUSTRY BACK-LINKS --><\/p>\n<div style=\"background: #f5f7fa; border: 1px solid #e0e0e0; border-left: 4px solid #a68f65; padding: 28px 32px; margin: 36px 0;\">\n<h2 style=\"color: #002147; font-size: 18px; font-weight: bold; margin: 0 0 8px 0;\">Related Industry Practice<\/h2>\n<div style=\"display: flex; flex-wrap: wrap; gap: 12px;\"><a style=\"display: inline-block; background: #002147; color: #fff; padding: 10px 22px; text-decoration: none; font-size: 13px; font-weight: 600; letter-spacing: 0.5px;\" href=\"https:\/\/bondstonelaw.com\/practice-areas\/real-estate-and-construction-law-firm-in-kazakhstan\/\">Real Estate &amp; Construction \u2192<\/a><br \/>\n<a style=\"display: inline-block; background: #a68f65; color: #fff; padding: 10px 22px; text-decoration: none; font-size: 13px; font-weight: 600; letter-spacing: 0.5px;\" href=\"https:\/\/bondstonelaw.com\/practice-areas\/energy-and-natural-resources-in-kazakhstan\/\">Energy &amp; Natural Resources \u2192<\/a><br \/>\n<a style=\"display: inline-block; background: #a68f65; color: #fff; padding: 10px 22px; text-decoration: none; font-size: 13px; font-weight: 600; letter-spacing: 0.5px;\" href=\"https:\/\/bondstonelaw.com\/construction-licensing-in-kazakhstan\/\">Construction Licensing \u2192<\/a><br \/>\n<a style=\"display: inline-block; background: #a68f65; color: #fff; padding: 10px 22px; text-decoration: none; font-size: 13px; font-weight: 600; letter-spacing: 0.5px;\" href=\"https:\/\/bondstonelaw.com\/property-registration-in-kazakhstan\/\">Property Registration \u2192<\/a><br \/>\n<a style=\"display: inline-block; background: #a68f65; color: #fff; padding: 10px 22px; text-decoration: none; font-size: 13px; font-weight: 600; letter-spacing: 0.5px;\" href=\"https:\/\/bondstonelaw.com\/land-use-rights-in-kazakhstan\/\">Land Use Rights \u2192<\/a><\/div>\n<\/div>\n<p><!-- \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 --><br \/>\n<!-- CTA --><\/p>\n<h2>Discuss your Kazakhstan EPC or construction contract matter<\/h2>\n<p>Contact Bond Stone for a confidential discussion about EPC contract structuring, FIDIC adaptation, variation claims, or construction dispute resolution in Kazakhstan.<\/p>\n<p style=\"margin: 24px 0;\"><a style=\"display: inline-block; background: #002147; color: #fff; padding: 14px 36px; text-decoration: none; font-size: 14px; font-weight: 600; letter-spacing: 0.5px;\" href=\"https:\/\/bondstonelaw.com\/contact\/\">Request a Confidential Consultation<\/a><\/p>\n<p><a style=\"color: #a68f65; text-decoration: none; font-weight: 600; margin-right: 24px;\" href=\"https:\/\/bondstonelaw.com\/practice-areas\/dispute-resolution-kazakhstan\/\">Dispute Resolution \u2192<\/a><br \/>\n<a style=\"color: #a68f65; text-decoration: none; font-weight: 600; margin-right: 24px;\" href=\"https:\/\/bondstonelaw.com\/practice-areas\/astana-international-financial-center-for-global-investors\/\">AIFC Practice \u2192<\/a><br \/>\n<a style=\"color: #a68f65; text-decoration: none; font-weight: 600; margin-right: 24px;\" href=\"https:\/\/bondstonelaw.com\/property-registration-in-kazakhstan\/\">Property Registration \u2192<\/a><br \/>\n<a style=\"color: #a68f65; text-decoration: none; font-weight: 600; margin-right: 24px;\" href=\"https:\/\/bondstonelaw.com\/land-use-rights-in-kazakhstan\/\">Land Use Rights \u2192<\/a><br \/>\n<a style=\"color: #a68f65; text-decoration: none; font-weight: 600; margin-right: 24px;\" href=\"https:\/\/bondstonelaw.com\/practice-areas\/energy-and-natural-resources-in-kazakhstan\/\">Energy &amp; Natural Resources \u2192<\/a><br \/>\n<a style=\"color: #a68f65; text-decoration: none; font-weight: 600;\" href=\"https:\/\/bondstonelaw.com\/practice-areas\/invest-in-kazakhstan\/\">Investment in Kazakhstan \u2192<\/a><\/p>\n<p style=\"color: #999; font-size: 12px; margin-top: 24px;\"><em>Primary authority: <a style=\"color: #a68f65; text-decoration: none;\" href=\"https:\/\/adilet.zan.kz\" target=\"_blank\" rel=\"noopener\">adilet.zan.kz<\/a> \u2014 Civil Code of the Republic of Kazakhstan No. 409-I (Chapter 33); Law on Architectural, Town-Planning and Construction Activity No. 242-IV; Law on Currency Regulation and Currency Control No. 57<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>EPC Contracts and FIDIC in Kazakhstan REAL ESTATE &amp; CONSTRUCTION \u00a0\u00b7\u00a0 EPC &amp; CONSTRUCTION CONTRACTS Kazakhstan&#8217;s infrastructure pipeline \u2014 spanning BRI corridor logistics, energy sector capital projects, and Special Economic Zone industrial construction \u2014 draws EPC contractors from China, Turkey, Europe, and the Gulf region. FIDIC-based contracts are standard in these mandates, but they must [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5066","page","type-page","status-publish","hentry"],"translation":{"provider":"WPGlobus","version":"3.0.5","language":"ru","enabled_languages":["en","ru"],"languages":{"en":{"title":true,"content":true,"excerpt":false},"ru":{"title":false,"content":false,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/bondstonelaw.com\/ru\/wp-json\/wp\/v2\/pages\/5066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bondstonelaw.com\/ru\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bondstonelaw.com\/ru\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bondstonelaw.com\/ru\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/bondstonelaw.com\/ru\/wp-json\/wp\/v2\/comments?post=5066"}],"version-history":[{"count":3,"href":"https:\/\/bondstonelaw.com\/ru\/wp-json\/wp\/v2\/pages\/5066\/revisions"}],"predecessor-version":[{"id":5087,"href":"https:\/\/bondstonelaw.com\/ru\/wp-json\/wp\/v2\/pages\/5066\/revisions\/5087"}],"wp:attachment":[{"href":"https:\/\/bondstonelaw.com\/ru\/wp-json\/wp\/v2\/media?parent=5066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}